Skip to content Demo Fictional company · a CoreStruct sample site
Solutions01
Products and Services02
Industries03
Work04
Company05
Resources06
Speak to a specialist Contact

Work

Work delivered, with the figure behind it

A selection of contracts delivered between 2022 and 2025. The figures are illustrative and belong to a fictional company; the structure is the one a real project file would use.

Projects delivered
350+
Countries
12
Client retention
98 %

Logistics · Honduras · Guatemala · El Salvador

Transforming critical operations at regional scale

A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.

-32 %

Uptime

+46 %

Capacity

99,9 %

Availability

3

Countries

Transandina Logística2023 – 2025

Infrastructure · Colombia

Forty-two kilometres of main, with the supply never cut

Rehabilitation and sectorisation of a trunk main running at 46 % losses, carried out in sections so that supply was maintained across the twenty-six months of works.

-31 %

Physical loss

42 km

Conveyance

18

Districts metered

0

Days without supply

Grupo Meridian2022 – 2024

Energy · Honduras

Extending a 138 kV substation without shutting down the region

Two new bays and a full protection system replacement on a live substation, with twelve hours of total outage split across two night windows.

12 h

Total outage

2

New bays

+65 MVA

Capacity

0

Protection events

Norvik Energía2024 – 2025

Manufacturing · Honduras

Contracted availability in milling

A five-year contract on milling utilities, with availability as the only payment metric.

99,4 %

Availability

-22 %

Maintenance cost

Cementos Talara2024

Corporate sector · Honduras · El Salvador

Electrical continuity for two data centres

A redesign of the critical power chain in two halls, with transfer tested under real load and no window of unavailability.

1,32

PUE achieved

+40 %

Usable capacity

Banco Peninsular2023

Manufacturing · Mexico

Standardising a pumping fleet

Nine pumping sets replaced by a single design, with the spares inventory reduced to one family.

-28 %

Capital tied up in spares

9

Assemblies

Vega Minerals2022 – 2023

Let's talk about your next challenge

Our team can help you identify the right solution for your organisation — including when the conclusion is that you do not need a project at all.