Fewer changes on site
Coordination between disciplines is resolved in the model. Across the last four projects, change orders caused by clashes fell from 9 % to 2.4 % of the contract value.
Capabilities
01Engineering and designStudies, FEED and detailed engineering02InfrastructureConstruction, installation and commissioning03Operations and maintenanceContracted asset availability04Digital transformationTelemetry, data and operating systems05Strategic consultingCapital and capacity decisions06Systems and equipmentIn-house manufacturing and specified equipment
Transforming critical operations at regional scale
A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.
See moreCatalogue
01AX-360 SeriesProcess pumping02TC-200 PanelControl and automation03SK-500 SkidModular assembliesAX-360 Series
Skid-mounted single-stage centrifugal pump, sized for continuous duty at altitudes and temperatures outside the standard catalogue range.
See moreAnalysis and reports
Papers from the technical team on capacity, continuity and measurement.
See moreStudies, FEED and detailed engineering
From the feasibility study to the shop drawings. We deliver engineering coordinated across disciplines, with a 3D model, a bill of materials and a decision trail that outlives the project.
We design facilities and equipment to run where precision and continuity are a condition of the business, not an aspiration in the tender.
01 / 05Benefits
Coordination between disciplines is resolved in the model. Across the last four projects, change orders caused by clashes fell from 9 % to 2.4 % of the contract value.
The bill of materials comes out of the same model as the drawings, so the budget and the design cannot drift apart without somebody noticing.
The operations team reviews the design before it is issued for construction: maintenance access, isolation points and working space.
Every design assumption is referenced to the standard behind it and to the person who approved it.
02 / 05Applications
The four briefs this capability is asked for most often.
Designing a new line inside a facility that cannot stop for more than 72 hours.
Swapping out major equipment under access, lifting and space constraints.
Bringing existing installations up to a new standard, with a survey and a staged plan.
Assessing the true condition of an asset before a purchase or a contract renewal.
03 / 05Process
04 / 05Case study
A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.
-32 %
Uptime
+46 %
Capacity
99,9 %
Availability
3
Countries
05 / 05Related industries
FAQFrequently asked questions
Our team can help you identify the right solution for your organisation — including when the conclusion is that you do not need a project at all.