Assumptions that survive the works
The costs and durations in the study come from the same database the infrastructure division prices real works with.
Capabilities
01Engineering and designStudies, FEED and detailed engineering02InfrastructureConstruction, installation and commissioning03Operations and maintenanceContracted asset availability04Digital transformationTelemetry, data and operating systems05Strategic consultingCapital and capacity decisions06Systems and equipmentIn-house manufacturing and specified equipment
Transforming critical operations at regional scale
A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.
See moreCatalogue
01AX-360 SeriesProcess pumping02TC-200 PanelControl and automation03SK-500 SkidModular assembliesAX-360 Series
Skid-mounted single-stage centrifugal pump, sized for continuous duty at altitudes and temperatures outside the standard catalogue range.
See moreAnalysis and reports
Papers from the technical team on capacity, continuity and measurement.
See moreCapital and capacity decisions
Studies that end in a recommendation with a number and a date. We work with teams who then have to build and run what was recommended, which is what keeps the assumptions inside the realm of the possible.
We support investment and capacity decisions with the same technical rigour it would take to carry them out afterwards.
01 / 05Benefits
The costs and durations in the study come from the same database the infrastructure division prices real works with.
Every study compares at least three routes, including doing nothing, with the present value and the risk of each set out.
The recommendation arrives with a sequence, owners, milestones and the exact point at which it is worth stopping to review.
If the study recommends a technology we do not supply, that is what it says. Any conflict of interest is declared in the report.
02 / 05Applications
The four briefs this capability is asked for most often.
Whether to expand, relocate or outsource capacity, with the number behind each option.
Actual condition, hidden technical liabilities and the cost of putting it right, before the deal closes.
An investment sequence setting out what is done first and what can wait without putting the operation at risk.
Identifying the single points of failure and what covering them actually costs.
03 / 05Process
04 / 05Case study
A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.
-32 %
Uptime
+46 %
Capacity
99,9 %
Availability
3
Countries
05 / 05Related industries
FAQFrequently asked questions
Our team can help you identify the right solution for your organisation — including when the conclusion is that you do not need a project at all.