Skip to content Demo Fictional company · a CoreStruct sample site
Solutions01
Products and Services02
Industries03
Work04
Company05
Resources06
Speak to a specialist Contact

Construction, installation and commissioning

Infrastructure

Civil works, installation and commissioning under one accountable party. We work to a critical path, measure physical progress weekly, and close out with documentation that leaves the asset ready to run and ready to audit.

Projects delivered
210
Contractual schedule met
94 %
Lost-time incidents (18 months)
0
02Cable-stayed viaduct · typical section

Infrastructure in one line

We build and install industrial and civil works, accountable for the schedule, the cost and the commissioning of the asset.

  • Industrial civil works: foundations, structures and pavements
  • Mechanical installation of static and rotating equipment
  • Medium- and low-voltage electrical installations
  • Instrumentation and control systems
  • Testing, pre-commissioning and commissioning
  • Permits, safety and site personnel management

01 / 05Benefits

What changes for the client

One accountable party

Civil, mechanical, electrical and instrumentation under one contract: there is no boundary where two contractors point at each other.

Physical progress, not declared progress

The weekly cut is measured against quantities installed and verified on site, not against the percentage the programme expected.

Shutdowns planned to the hour

Intervention windows are planned hour by hour, with the isolation sequence, the tests and the return to service rehearsed before the shutdown.

A handover you can operate from

The asset is handed over with a quality dossier, signed test certificates, as-built drawings and training for the people who will run it.

02 / 05Applications

Where it applies

The four briefs this capability is asked for most often.

New-build plant

Complete construction from earthworks to first certified production.

Expansion while running

Works inside a live facility, with zoned isolation and clash control.

Major shutdown

A scheduled maintenance and intervention window with a critical sequence and reinforced crews.

Refurbishment

Bringing existing infrastructure back into service, after a structural assessment.

03 / 05Process

How it is delivered

  1. 01PlanningCritical path, safety plan, quality plan and materials logistics before anyone mobilises.
  2. 02MobilisationSite set-up, personnel induction and document checks on the subcontractors.
  3. 03DeliveryProgress measured against quantities, non-conformances closed out, and a weekly cut with the client.
  4. 04HandoverTesting, supported commissioning, the quality dossier and formal release of the asset.

04 / 05Case study

Transforming critical operations at regional scale

A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.

Multimodal corridor · network schematic

Client Transandina Logística Country Honduras · Guatemala · El Salvador

-32 %

Uptime

+46 %

Capacity

99,9 %

Availability

3

Countries

FAQFrequently asked questions

What clients ask before signing

How is schedule risk handled?
With intermediate contractual milestones and a contingency reserve declared separately. If a milestone is at risk, the report says so that same week, not at handover.
Do you work on lump-sum contracts?
Yes, when the engineering is far enough along for the scope to be closed. With incomplete engineering we prefer unit rates: a lump sum over an open scope ends in a claim.
Who is accountable for subcontractor safety?
Aurelis. There is one safety plan for the site, and subcontracted personnel get the same induction and the same audits.
What happens if an unforeseen condition turns up?
It is recorded, priced and presented before it is carried out. No additional work is invoiced without prior written authorisation.

Let's talk about your next challenge

Our team can help you identify the right solution for your organisation — including when the conclusion is that you do not need a project at all.