Measurement where there was an estimate
Consumption, yield and availability stop being worked out at month end. The argument becomes what to do, not whether the figure is right.
Capabilities
01Engineering and designStudies, FEED and detailed engineering02InfrastructureConstruction, installation and commissioning03Operations and maintenanceContracted asset availability04Digital transformationTelemetry, data and operating systems05Strategic consultingCapital and capacity decisions06Systems and equipmentIn-house manufacturing and specified equipment
Transforming critical operations at regional scale
A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.
See moreCatalogue
01AX-360 SeriesProcess pumping02TC-200 PanelControl and automation03SK-500 SkidModular assembliesAX-360 Series
Skid-mounted single-stage centrifugal pump, sized for continuous duty at altitudes and temperatures outside the standard catalogue range.
See moreAnalysis and reports
Papers from the technical team on capacity, continuity and measurement.
See moreTelemetry, data and operating systems
Digitising an operation is not installing a dashboard. It is measuring what used to be estimated, connecting it to the system already in place, and leaving the plant floor with a tool that answers faster than the spreadsheet it replaces.
We instrument the operation and turn the signal into decisions: telemetry, traceability and systems the plant floor actually uses.
01 / 05Benefits
Consumption, yield and availability stop being worked out at month end. The argument becomes what to do, not whether the figure is right.
We work on the control system already installed. Replacing the PLC in a plant that works is rarely the part that pays for itself.
Network segmentation, data diodes where they belong, and no remote access without two-factor authentication and logging. The industrial network is not exposed so that somebody can look at a chart.
The project does not close on deployment: it closes when weekly use by plant staff has held for three months.
02 / 05Applications
The four briefs this capability is asked for most often.
One dashboard of production, consumption and downtime, for the floor and for the board.
Early detection of degradation in rotating equipment from vibration and consumption.
Automatic logging of parameters per batch, for audit and for quality claims.
Metering by consumption centre and detection of deviations against the expected curve.
03 / 05Process
04 / 05Case study
Rehabilitation and sectorisation of a trunk main running at 46 % losses, carried out in sections so that supply was maintained across the twenty-six months of works.
-31 %
Physical loss
42 km
Conveyance
18
Districts metered
0
Days without supply
05 / 05Related industries
FAQFrequently asked questions
Our team can help you identify the right solution for your organisation — including when the conclusion is that you do not need a project at all.