Tested before it leaves
Every assembly is works-tested to a protocol the client witnesses or audits. What arrives on site has already worked once.
Capabilities
01Engineering and designStudies, FEED and detailed engineering02InfrastructureConstruction, installation and commissioning03Operations and maintenanceContracted asset availability04Digital transformationTelemetry, data and operating systems05Strategic consultingCapital and capacity decisions06Systems and equipmentIn-house manufacturing and specified equipment
Transforming critical operations at regional scale
A logistics operator running six terminals across three countries was moving freight on systems that did not talk to each other. We redesigned the operation of the entire corridor and instrumented it point by point.
See moreCatalogue
01AX-360 SeriesProcess pumping02TC-200 PanelControl and automation03SK-500 SkidModular assembliesAX-360 Series
Skid-mounted single-stage centrifugal pump, sized for continuous duty at altitudes and temperatures outside the standard catalogue range.
See moreAnalysis and reports
Papers from the technical team on capacity, continuity and measurement.
See moreIn-house manufacturing and specified equipment
Our own workshop for what a catalogue cannot cover: process skids, control panels, steelwork and rotating assemblies. Specified, built, works-tested and backed by spares held in the region.
We manufacture and integrate equipment for conditions the standard catalogue does not reach, backed by spares and service in the region.
01 / 05Benefits
Every assembly is works-tested to a protocol the client witnesses or audits. What arrives on site has already worked once.
Altitude, temperature, power quality and how aggressive the environment is all go into the specification. Equipment sized for another climate fails two years later.
Critical stock in Tegucigalpa and Mexico City: 72 hours, against the six to ten weeks an import takes.
Drawings, bill of materials, settings and procedures are delivered with the equipment, not under a separate service contract.
02 / 05Applications
The four briefs this capability is asked for most often.
Altitude, salt-laden air or temperatures outside the catalogue range.
An equivalent assembly when the original manufacturer no longer supports it.
Unifying panels and spares across sites that grew without a common standard.
Prefabricated assemblies that cut site work and the shutdown window.
03 / 05Process
04 / 05Case study
Rehabilitation and sectorisation of a trunk main running at 46 % losses, carried out in sections so that supply was maintained across the twenty-six months of works.
-31 %
Physical loss
42 km
Conveyance
18
Districts metered
0
Days without supply
05 / 05Related industries
FAQFrequently asked questions
Our team can help you identify the right solution for your organisation — including when the conclusion is that you do not need a project at all.