Contracted asset availability

Operations and maintenance

Contracts where what you buy is availability. We run the asset, maintain the equipment and answer for an agreed indicator, with a control centre watching 4,800 measurement points continuously.

Assets under contract
4 800
Average contracted availability
99,4 %
Control centre cover
24 / 7
03Assembly cell · general elevation

Operations and maintenance in one line

We take on the operation and maintenance of the asset under a measured availability commitment, not a promise of attention.

  • Operations contracts with an availability indicator
  • Scheduled preventive and corrective maintenance
  • Predictive diagnostics from vibration, thermography and consumption
  • Critical spares management and technical store
  • 24/7 control centre and event response
  • Training and certification for the client's own staff

01 / 05Benefits

What changes for the client

The risk changes sides

The contract is paid against availability achieved. If the asset is not available, the penalty is ours — not a discount somebody has to go and claim.

Failures caught, not attended

The predictive model over vibration, temperature and consumption brings the intervention forward. In 2025, 71 % of major interventions were planned before the failure.

Spares where they need to be

Critical stock is sized by criticality and replenishment lead time, not by habit. On two contracts it cut tied-up capital by 28 %.

A history that stays with the asset

The full intervention history lives on the client's platform. If the contract ends, the information stays with the asset.

02 / 05Applications

Where it applies

The four briefs this capability is asked for most often.

Process plant

Running the utilities under a continuity commitment to the production line.

Distributed assets

Maintaining geographically dispersed sites, with an agreed route and response time.

Rotating equipment fleet

Pumps, compressors and motors under a predictive programme with a measured baseline.

Operator transition

Taking over an existing asset, with an inventory, a survey and a stabilisation plan.

03 / 05Process

How it is delivered

  1. 01BaselineThe asset's real condition and current performance are measured before any indicator is committed to.
  2. 02TransitionNinety days of supported operation, with the outgoing and incoming teams working in parallel.
  3. 03Steady stateOperation at steady state, with monthly indicator reporting and a quarterly contract review.
  4. 04ImprovementEach quarter commits one improvement action, with its estimated saving and its later verification.

04 / 05Case study

Forty-two kilometres of main, with the supply never cut

Rehabilitation and sectorisation of a trunk main running at 46 % losses, carried out in sections so that supply was maintained across the twenty-six months of works.

Trunk main · typical section

Client Grupo Meridian Country Colombia

-31 %

Physical loss

42 km

Conveyance

18

Districts metered

0

Days without supply

FAQFrequently asked questions

What clients ask before signing

What counts as unavailability?
It is defined in the contract, event by event, before signing. Force majeure and client-requested shutdowns are excluded and listed explicitly.
Is the client's existing team kept on?
In most transitions yes, and it is usually the better outcome. The transfer is agreed before signing, not after.
What visibility does the client have?
Full access to the same dashboard our control centre uses, in real time, plus a signed monthly report.
What is the minimum term?
Thirty-six months. An availability commitment needs at least one full major-maintenance cycle to mean anything.